- v50 information can now be added to pages in the main namespace. v0.47 information can still be found in the DF2014 namespace. See here for more details on the new versioning policy.
- Use this page to report any issues related to the migration.
v0.34:Double-slit method
QuantumMenace has developed a method how to drill through an aquifer of an unknown depth commonly known as the double-slit method. This is a newbie-friendly and detailed tutorial based on Quantum's original forum post.
Even in this newbie-friendly tutorial it won't harm if you first train this on an embark which you don't intend to play after you've made it through the aquifer. Therefore I suggest you take this embark setup:
Suggested embark setup
- 1 Proficient Miner
- 3 Proficient Masons
- 1 Proficient Carpenter
- 1 Proficient Woodcutter
- 1 Proficient Mechanic
sell the anvil to buy:
- 30+ stones (you will need 16 pieces of building material per aquifer level)
- 4 logs (to build a carpenter's workshop and a pump)
Make sure you have at least:
- 1 (battle) axe
- 1 pick
to cut down trees and mine
Procedure
Preparation
Using your logs of wood, you
1. Build a carpenter's workshop
Your carpenter will use this workshop to craft all the parts necessary to build a pump, i.e.:
2. a block
3. an enormous corkscrew
4. a pipe section
5. Dig a 2×2 staircase until you reach the aquifer layer.
Digging through the aquifer
1. Make yourself an access to the aquifer layer:
![]() 4. Build a pump there, pumping from the west (make sure one of your dwarves has the architecture labor enabled). |
2. Make sure you have at least one dwarf with the pump operating labor enabled. Start pumping the water from one side to another. And build walls around the first quadrant.
3. Deconstruct the water pump, build it facing the other direction and start pumping again. Build walls around the second quadrant accordingly.
4. Deconstruct the pump and the floor tiles in your non-aquifer layer and construct an up/down staircase there instead.
5. The procedure for building walls in the third quadrant differs slightly from what you have been building until now.
6. Now for the last quadrant. Deconstruct the pump and build it to pump to the opposite direction. It will spill some water on its level while pumping, but it isn't dangerous.
7. We will now deal with the last piece of aquifer.
8. Level done
If you see there is another aquifer layer below, you repeat the steps in sections 1-7. To dig through one layer of aquifer this way will take you 2 or 3 months in-game time.
[hide]
Worlds | |
---|---|