v50 Steam/Premium information for editors
- v50 information can now be added to pages in the main namespace. v0.47 information can still be found in the DF2014 namespace. See here for more details on the new versioning policy.
- Use this page to report any issues related to the migration.
This notice may be cached—the current version can be found here.
Editing DF2014:Manager
Jump to navigation
Jump to search
Warning: You are not logged in.
Your IP address will be recorded in this page's edit history.
You are editing a page for an older version of Dwarf Fortress ("Main" is the current version, not "DF2014"). Please make sure you intend to do this. If you are here by mistake, see the current page instead.
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 88: | Line 88: | ||
#Enter the quantity of items you want to produce (0 for a perpetual order). | #Enter the quantity of items you want to produce (0 for a perpetual order). | ||
#Your work order will appear in the list. | #Your work order will appear in the list. | ||
− | |||
− | |||
− | |||
On creation of that order, it can be further customized; changing the {{K|c}}onditions for the order being fulfilled and repeated (see next sections) and adjusting the {{K|d}}etails of an order specifying type of material used in the making of the item (if applicable). As well as {{K|r}}emove it, raise its {{K|p}}riority, make it max ({{K|t}}op) priority, change its priority, or {{K|Enter}} limit the amount of workshops the order can be tasked to. | On creation of that order, it can be further customized; changing the {{K|c}}onditions for the order being fulfilled and repeated (see next sections) and adjusting the {{K|d}}etails of an order specifying type of material used in the making of the item (if applicable). As well as {{K|r}}emove it, raise its {{K|p}}riority, make it max ({{K|t}}op) priority, change its priority, or {{K|Enter}} limit the amount of workshops the order can be tasked to. |