v50 Steam/Premium information for editors
  • v50 information can now be added to pages in the main namespace. v0.47 information can still be found in the DF2014 namespace. See here for more details on the new versioning policy.
  • Use this page to report any issues related to the migration.
This notice may be cached—the current version can be found here.

Editing 40d:Bridge

Jump to navigation Jump to search

Warning: You are not logged in.
Your IP address will be recorded in this page's edit history.

You are editing a page for an older version of Dwarf Fortress ("Main" is the current version, not "40d"). Please make sure you intend to do this. If you are here by mistake, see the current page instead.

The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.

Latest revision Your text
Line 1: Line 1:
{{av}}
 
{{Quality|Exceptional}}
 
 
A '''bridge''' is a building (not a construction) that spans multiple tiles allowing [[dwarves]] to go across [[water]], [[magma]], and other obstructions.  Bridges are built from the {{k|b}}uild menu, under brid{{k|g}}e.
 
A '''bridge''' is a building (not a construction) that spans multiple tiles allowing [[dwarves]] to go across [[water]], [[magma]], and other obstructions.  Bridges are built from the {{k|b}}uild menu, under brid{{k|g}}e.
  
Line 16: Line 14:
 
A drawbridge can be connected to a [[lever]] or [[pressure plate]].  When the lever is pulled, after a delay of 100 steps the bridge will raise in the direction specified at construction.  The direction that a bridge raises can be slightly confusing: if a drawbridge raises to the left, then it forms a wall on the left side when raised. A drawbridge that raises requires a [[floor]] underneath the side towards which it will raise (on the tiles where the "[[wall]]" will form when raised); remember to take this into account when digging.
 
A drawbridge can be connected to a [[lever]] or [[pressure plate]].  When the lever is pulled, after a delay of 100 steps the bridge will raise in the direction specified at construction.  The direction that a bridge raises can be slightly confusing: if a drawbridge raises to the left, then it forms a wall on the left side when raised. A drawbridge that raises requires a [[floor]] underneath the side towards which it will raise (on the tiles where the "[[wall]]" will form when raised); remember to take this into account when digging.
  
A drawbridge, when raised becomes a wall, and when lowered it will crush anything that is standing where the drawbridge exists when lowered. This has earned it the name ''[[Dwarven Atom Smasher|dwarven atom-smasher]]''. Some players may consider the crushing power of the drawbridge to be an [[exploit]] — the only units that survive the smash are those with a [SIZE] greater than 10 ([[megabeast]]s, [[demon]]s, [[caravan|wagon]]s, and several other large creatures, such as [[Elephant]]s) - rather than being crushed, they will cause the bridge to instantly deconstruct.
+
A drawbridge, when raised will crush anything standing on the tile that becomes a wall, and when lowered it will crush anything that is standing where the drawbridge exists when lowered. This has earned it the name ''[[Dwarven Atom Smasher|dwarven atom-smasher]]''. Some players may consider the crushing power of the drawbridge to be an [[exploit]] — the only units that survive the smash are those with a [SIZE] greater than 10 ([[megabeast]]s, [[demon]]s, [[caravan|wagon]]s, and several other large creatures, such as [[Elephant]]s) - rather than being crushed, they will cause the bridge to instantly deconstruct.
  
 
[[Image:DoingItRight.png|left|thumb|200px|Creatures standing on a raised drawbridge will, after being flung, fall if they are above a pit. This can be a very successful tactic to eliminating a frontal assault.]]
 
[[Image:DoingItRight.png|left|thumb|200px|Creatures standing on a raised drawbridge will, after being flung, fall if they are above a pit. This can be a very successful tactic to eliminating a frontal assault.]]
Line 33: Line 31:
 
Any item sitting on the retracting bridge has a 1/4 chance of being flung. They can be flung anywhere from zero to 3 Z levels upward and up to 3 units in to the sides.
 
Any item sitting on the retracting bridge has a 1/4 chance of being flung. They can be flung anywhere from zero to 3 Z levels upward and up to 3 units in to the sides.
  
{{buildings}}
+
[[Category:Constructions]]
 +
[[Category:Buildings]]

Please note that all contributions to Dwarf Fortress Wiki are considered to be released under the GFDL & MIT (see Dwarf Fortress Wiki:Copyrights for details). If you do not want your writing to be edited mercilessly and redistributed at will, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource. Do not submit copyrighted work without permission!

To protect the wiki against automated edit spam, we kindly ask you to solve the following CAPTCHA:

Cancel Editing help (opens in new window)

Templates used on this page: